Kitchen refurbishment
Canary Wharf
Project brief:
Fully kitchen refurbishment
Work carried out:
Full kitchen strip out, including damaged plasterboard walls due to the water leak. New full electrical rewire and moisture resistant plasterboards fitted all over the walls. Shift and installation of new pipework, supply and fit new kitchen, installation all of the kitchen appliances. Assembly worktop and splashback, installing new electrical underfloor heating, painting throughout.